lexiara

anx_V__cpt_1__cpt_4__cpt_4

Text with EEA relevance.

4.4. A flight must not be commenced or continued unless the aircraft's scheduled performance, considering all factors which significantly affect its performance level, allows all phases of flight to be executed within the applicable distances/areas and obstacle clearances at the planned operating mass. Performance factors which significantly affect take-off, en-route and approach/landing are, particularly: operating procedures; pressure altitude of the aerodrome; weather conditions (temperature, wind, precipitation and visual range); size, slope and condition of the take-off/landing area; and the condition of the airframe, the power plant or the systems, taking into account possible deterioration.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-12 · Text as adopted (Official Journal); later amendments are not incorporated in this text.