lexiara

SECTION A: NATIONAL PLAN

Text with EEA relevance.

Political, economic, environmental, and social context of the plan Strategy relating to the five dimensions of the Energy Union Overview table with key objectives, policies and measures of the plan National and Union energy system and policy context of the national plan Current energy and climate policies and measures relating to the five dimensions of the Energy Union Key issues of cross-border relevance Administrative structure of implementing national energy and climate policies Involvement of the national parliament Involvement of local and regional authorities Consultations of stakeholders, including the social partners, and engagement of civil society and the general public Consultations of other Member States Iterative process with the Commission Elements subject to joint or coordinated planning with other Member States Explanation of how regional cooperation is considered in the plan The elements set out in point (a)(1) of Article 4 Where applicable, other national objectives and targets consistent with the Paris Agreement and the existing long-term strategies. Where applicable for the contribution to the overall Union commitment of reducing the GHG emissions, other objectives and targets, including sector targets and adaptation goals, if available The elements set out in point (a)(2) of Article 4 Estimated trajectories for the sectoral share of renewable energy in final energy consumption from 2021 to 2030 in the electricity, heating and cooling, and transport sector Estimated trajectories by renewable energy technology that the Member State projects to use to achieve the overall and sectoral trajectories for renewable energy from 2021 to 2030, including expected total gross final energy consumption per technology and sector in Mtoe and total planned installed capacity (divided by new capacity and repowering) per technology and sector in MW Estimated trajectories on bioenergy demand, disaggregated between heat, electricity and transport, and on biomass supply by feedstocks and origin (distinguishing between domestic production and imports). For forest biomass, an assessment of its source and impact on the LULUCF sink Where applicable, other national trajectories and objectives, including those that are long term or sectoral (e.g. share of renewable energy in district heating, renewable energy use in buildings, renewable energy produced by cities, renewable energy communities and renewables self-consumers, energy recovered from the sludge acquired through the treatment of wastewater) The elements set out in point (b) of Article 4 The indicative milestones for 2030, 2040 and 2050, the domestically established measurable progress indicators, an evidence-based estimate of expected energy savings and wider benefits, and their contributions to the Union's energy efficiency targets as included in the roadmaps set out in the long-term renovation strategies for the national stock of residential and non-residential buildings, both public and private, in accordance with Article 2a of Directive 2010/31/EU Where applicable, other national objectives, including long-term targets or strategies and sectoral targets, and national objectives in areas such as energy efficiency in the transport sector and with regard to heating and cooling The elements set out in point (c) of Article 4 National objectives with regard to increasing: the diversification of energy sources and supply from third countries for the purpose of increasing the resilience of regional and national energy systems Where applicable, national objectives with regard to reducing energy import dependency from third countries, for the purpose of increasing the resilience of regional and national energy systems National objectives with regard to increasing the flexibility of the national energy system, in particular by means of deploying domestic energy sources, demand response and energy storage The level of electricity interconnectivity that the Member State aims for in 2030 in consideration of the electricity interconnection target for 2030 of at least 15 %, with a strategy with the level from 2021 onwards defined in close cooperation with affected Member States, taking into account the 2020 interconnection target of 10 % and the following indicators of the urgency of action: Price differential in the wholesale market exceeding an indicative threshold of EUR 2/MWh between Member States, regions or bidding zones; Nominal transmission capacity of interconnectors below 30 % of peak load; Nominal transmission capacity of interconnectors below 30 % of installed renewable generation. Each new interconnector shall be subject to a socioeconomic and environmental cost-benefit analysis and implemented only if the potential benefits outweigh the costs Key electricity and gas transmission infrastructure projects, and, where relevant, modernisation projects, that are necessary for the achievement of objectives and targets under the five dimensions of the Energy Union Strategy Where applicable, main infrastructure projects envisaged other than Projects of Common Interest (PCIs) In accordance with Regulation (EU) No 347/2013 of the European Parliament and of the Council of 17 April 2013 on guidelines for trans-European energy infrastructure and repealing Decision No 1364/2006/EC and amending Regulations (EC) No 713/2009, (EC) No 714/2009 and (EC) No 715/2009 (OJ L 115, 25.4.2013, p. 39). National objectives related to other aspects of the internal energy market such as increasing system flexibility, in particular related to the promotion of competitively determined electricity prices in line with relevant sectoral law, market integration and coupling, aimed at increasing the tradeable capacity of existing interconnectors, smart grids, aggregation, demand response, storage, distributed generation, mechanisms for dispatching, re-dispatching and curtailment, and real-time price signals, including a timeframe for when the objectives shall be met Where applicable, national objectives related to the non-discriminatory participation of renewable energy, demand response and storage, including via aggregation, in all energy markets, including a timeframe for when the objectives are to be met Where applicable, national objectives with regard to ensuring that consumers participate in the energy system and benefit from self-generation and new technologies, including smart meters; National objectives with regard to ensuring electricity system adequacy, as well as for the flexibility of the energy system with regard to renewable energy production, including a timeframe for when the objectives are to be met Where applicable, national objectives to protect energy consumers and improve the competitiveness of the retail energy sector Where applicable, national objectives with regard to energy poverty, including a timeframe for when the objectives are to be met National objectives and funding targets for public and, where available, private research and innovation relating to the Energy Union, including, where appropriate, a timeframe for when the objectives are to be met Where available, national 2050 objectives related to the promotion of clean energy technologies and, where appropriate, national objectives, including long-term targets (2050) for deployment of low-carbon technologies, including for decarbonising energy and carbon-intensive industrial sectors and, where applicable, for related carbon transport and storage infrastructure Where applicable, national objectives with regard to competitiveness Policies and measures to achieve the target set under Regulation (EU) 2018/842 as referred in point 2.1.1 and policies and measures to comply with Regulation (EU) 2018/841, covering all key emitting sectors and sectors for the enhancement of removals, with an outlook to the long-term vision and goal to become a low emission economy and achieving a balance between emissions and removals in accordance with the Paris Agreement Where relevant, regional cooperation in this area Without prejudice to the applicability of State aid rules, financing measures, including Union support and the use of Union funds, in this area at national level, where applicable Policies and measures to achieve the national contribution to the binding 2030 Union target for renewable energy and trajectories as referred to in point (a)(2) Article 4, and, where applicable or available, the elements referred to in point 2.1.2 of this Annex, including sector- and technology-specific measures When planning those measures, Member States shall take into account the end of life of existing installations and the potential for repowering. Where relevant, specific measures for regional cooperation, as well as, as an option, the estimated excess production of energy from renewable sources which could be transferred to other Member States in order to achieve the national contribution and trajectories referred to in point 2.1.2 Specific measures on financial support, where applicable, including Union support and the use of Union funds, for the promotion of the production and use of energy from renewable sources in electricity, heating and cooling, and transport Where applicable, the assessment of the support for electricity from renewable sources that Member States are to carry out pursuant to Article 6(4) of Directive (EU) 2018/2001 Specific measures to introduce one or more contact points, streamline administrative procedures, provide information and training, and facilitate the uptake of power purchase agreements Summary of the policies and measures under the enabling framework Member States have to put in place pursuant to Article 21(6) and Article 22(5) of Directive (EU) 2018/2001 to promote and facilitate the development of self-consumption and renewable energy communities Assessment of the necessity to build new infrastructure for district heating and cooling produced from renewable sources Where applicable, specific measures on the promotion of the use of energy from biomass, especially for new biomass mobilisation taking into account: biomass availability, including sustainable biomass: both domestic potential and imports from third countries other biomass uses by other sectors (agriculture and forest-based sectors); as well as measures for the sustainability of biomass production and use Where applicable, national policies and measures affecting the EU ETS sector and assessment of the complementarity and impacts on the EU ETS Policies and measures to achieve other national targets, where applicable Policies and measures to achieve low emission mobility (including electrification of transport) Where applicable, national policies, timelines and measures planned to phase out energy subsidies, in particular for fossil fuels Planned policies, measures and programmes to achieve the indicative national energy efficiency contributions for 2030 as well as other objectives referred to in point 2.2, including planned measures and instruments (also of a financial nature) to promote the energy performance of buildings, in particular with regard to the following: Energy efficiency obligation schemes and alternative policy measures under Articles 7a and 7b and Article 20(6) of Directive 2012/27/EU and to be prepared in accordance with Annex III to this Regulation Long-term renovation strategy to support the renovation of the national stock of residential and non-residential buildings, both public and private In accordance with Article 2a of Directive 2010/31/EU. , including policies, measures and actions to stimulate cost-effective deep renovation and policies and actions to target the worst performing segments of the national building stock, in accordance with Article 2a of Directive 2010/31/EU Description of policy and measures to promote energy services in the public sector and measures to remove regulatory and non-regulatory barriers that impede the uptake of energy performance contracting and other energy efficiency service models In accordance with Article 18 of Directive 2012/27/EU. Other planned policies, measures and programmes to achieve the indicative national energy efficiency contributions for 2030 as well as other objectives referred to in point 2.2 (for example measures to promote the exemplary role of public buildings and energy-efficient public procurement, measures to promote energy audits and energy management systems In accordance with Article 8 of Directive 2012/27/EU. , consumer information and training measures In accordance with Articles 12 and 17 of Directive 2012/27/EU , and other measures to promote energy efficiency In accordance with Article 19 of Directive 2012/27/EU. ) Where applicable, a description of policies and measures to promote the role of local renewable energy communities in contributing to the implementation of policies and measures in points i, ii, iii and iv Description of measures to develop measures to utilise energy efficiency potentials of gas and electricity infrastructure In accordance with Article 15(2) of Directive 2012/27/EU. Regional cooperation in this area, where applicable Financing measures, including Union support and the use of Union funds, in the area at national level Policies and measures related to the elements set out in point 2.3 Consistency shall be ensured with the preventive action and emergency plans under Regulation (EU) 2017/1938 of the European Parliament and of the Council of 25 October 2017 concerning measures to safeguard the security of gas supply and repealing Regulation (EU) No 994/2010 (OJ L 280, 28.10.2017, p. 1) as well as the risk preparedness plans under Regulation (EU) 2018/2001 [as proposed by COM(2016) 862 on risk-preparedness in the electricity sector and repealing Directive 2005/89/EC]. Regional cooperation in this area Where applicable, financing measures in this area at national level, including Union support and the use of Union funds Policies and measures to achieve the targeted level of interconnectivity as set out in point (d) of Article 4 Regional cooperation in this area Other than the PCI Regional Groups established under Regulation (EU) No 347/2013. Where applicable, financing measures in this area at national level, including Union support and the use of Union funds Policies and measures related to the elements set out in point 2.4.2, including, where applicable, specific measures to enable the delivery of Projects of Common Interest (PCIs) and other key infrastructure projects Regional cooperation in this area Other than the PCI Regional Groups established under Regulation (EU) No 347/2013. Where applicable, financing measures in this area at national level, including Union support and the use of Union funds Policies and measures related to the elements set out in point 2.4.3 Measures to increase the flexibility of the energy system with regard to renewable energy production such as smart grids, aggregation, demand response, storage, distributed generation, mechanisms for dispatching, re-dispatching and curtailment, real-time price signals, including the roll-out of intraday market coupling and cross-border balancing markets Where applicable, measures to ensure the non-discriminatory participation of renewable energy, demand response and storage, including via aggregation, in all energy markets Policies and measures to protect consumers, especially vulnerable and, where applicable, energy poor consumers, and to improve the competitiveness and contestability of the retail energy market Description of measures to enable and develop demand response, including those addressing tariffs to support dynamic pricing In accordance with Article 15(8) of Directive 2012/27/EU. Where applicable, policies and measures to achieve the objectives set out in point 2.4.4 Policies and measures related to the elements set out in point 2.5 Where applicable, cooperation with other Member States in this area, including, where appropriate, information on how the SET Plan objectives and policies are being translated to a national context Where applicable, financing measures in this area at national level, including Union support and the use of Union funds

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-28 · Text as adopted (Official Journal); later amendments are not incorporated in this text.