10. Regional outage planning coordination
Each Regional coordination centre shall carry out regional outage coordination in accordance with the procedures set out in the system operation guideline adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009 in order to monitor the availability status of the relevant assets and coordinate their availability plans to ensure the operational security of the transmission system, while maximising the capacity of the interconnectors and the transmission systems affecting cross-zonal flows. Each Regional coordination centre shall maintain a single list of relevant grid elements, power generating modules and demand facilities of the system operation region and make it available on the ENTSO for Electricity operational planning data environment. Each Regional coordination centre shall carry out the following activities related to outage coordination in the system operation region: assess outage planning compatibility using all transmission system operators' year-ahead availability plans; provide the transmission system operators in the system operation region with a list of detected planning incompatibilities and the solutions it proposes to solve the incompatibilities.
← anx_I__cpt_1__cpt_9__item_4__text_1 · All articles · 10.1 →
Source: EUR-Lex (Cellar) · retrieved 2026-10-30 · Text as adopted (Official Journal); later amendments are not incorporated in this text.