lexiara

anx_I__cpt_1__cpt_10__item_1__text_1

Text with EEA relevance.

Each Regional coordination centre shall carry out regional outage coordination in accordance with the procedures set out in the system operation guideline adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009 in order to monitor the availability status of the relevant assets and coordinate their availability plans to ensure the operational security of the transmission system, while maximising the capacity of the interconnectors and the transmission systems affecting cross-zonal flows.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-30 · Text as adopted (Official Journal); later amendments are not incorporated in this text.