lexiara

anx_I__cpt_1__cpt_5__item_3__text_1

Text with EEA relevance.

Regional coordination centres shall be equipped with the close to real time supervisory control and data acquisition systems with the observability defined by applying the threshold referred to in point 4.2.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-30 · Text as adopted (Official Journal); later amendments are not incorporated in this text.