9. Week-ahead to at least day-ahead regional system adequacy assessments and preparation of risk reducing actions
Regional coordination centres shall carry out week-ahead to at least day-ahead regional adequacy assessments in accordance with the procedures set out in Regulation (EU) 2017/1485 and on the basis of the methodology developed pursuant Article 8 of Regulation (EU) 2019/941. Regional coordination centres shall base the short-term regional adequacy assessments on the information provided by the transmission system operators of system operation region with the aim of detecting situations where a lack of adequacy is expected in any of the control areas or at regional level. Regional coordination centres shall take into account possible cross-zonal exchanges and operational security limits in all relevant operational planning timeframes. When performing a regional system adequacy assessment, each regional coordination centre shall coordinate with other regional coordination centres to: verify the underlying assumptions and forecasts; detect possible cross-regional lack of adequacy situations. Each regional coordination centre shall deliver the results of the regional system adequacy assessments together with the actions it proposes to reduce risks of lack of adequacy to the transmission system operators in the system operation region and to other regional coordination centres.
← anx_I__cpt_1__cpt_8__item_2__point_b__text_1 · All articles · 9.1 →
Source: EUR-Lex (Cellar) · retrieved 2026-10-30 · Text as adopted (Official Journal); later amendments are not incorporated in this text.