lexiara

anx_I__cpt_1__cpt_9__item_2__text_1

Text with EEA relevance.

Regional coordination centres shall base the short-term regional adequacy assessments on the information provided by the transmission system operators of system operation region with the aim of detecting situations where a lack of adequacy is expected in any of the control areas or at regional level. Regional coordination centres shall take into account possible cross-zonal exchanges and operational security limits in all relevant operational planning timeframes.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-30 · Text as adopted (Official Journal); later amendments are not incorporated in this text.