1.
Text with EEA relevance.
Transmission system operators shall recalculate available cross-zonal capacity at least after day-ahead gate closure times and after intraday cross-zonal gate closure times. Transmission system operators shall allocate the available cross-zonal capacity plus any remaining cross-zonal capacity not previously allocated and any cross-zonal capacity released by physical transmission right holders from previous allocations in the following cross-zonal capacity allocation process.