lexiara

6.

Text with EEA relevance.

By 5 January 2020, the ENTSO for Electricity shall submit to ACER a draft methodology for calculating: the value of lost load; the cost of new entry for generation, or demand response; and the reliability standard referred to in Article 25. The methodology shall be based on transparent, objective and verifiable criteria.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-30 · Text as adopted (Official Journal); later amendments are not incorporated in this text.