lexiara

art_63__para_4__text_1

Text with EEA relevance.

The decision granting an exemption as referred to in paragraphs 1, 2 and 3 shall be taken on a case-by-case basis by the regulatory authorities of the Member States concerned. An exemption may cover all or part of the capacity of the new interconnector, or of the existing interconnector with significantly increased capacity.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-30 · Text as adopted (Official Journal); later amendments are not incorporated in this text.