Where a derogation is granted, for at least 40 % of the standard balancing products and a minimum of 30 % of all products used for balancing capacity, contracts for the balancing capacity shall be concluded for no more than one day before the provision of the balancing capacity and the contracting period shall be no longer than one day. The contracting of the remaining part of the balancing capacity shall be performed for a maximum of one month in advance of the provision of balancing capacity and shall have a maximum contractual period of one month.