(21) When performing capacity calculation, regional coordination centres should calculate cross-zonal capacities using data from transmission system operators which respects the operational security limits of the transmission system operators' respective control areas. Transmission system operators should be able to deviate from coordinated capacity calculation where its implementation would result in a violation of the operational security limits of network elements in their control area. Those deviations should be carefully monitored and transparently reported to prevent abuse and ensure that the volume of interconnection capacity to be made available to market participants is not limited in order to solve congestion inside a bidding zone. Where an action plan is in place, the action plan should take account of deviations and address their cause.