Owner of the gas turbines originally supplied by Siemens Gas Turbine Technologies OOO to OAO ‘VO TPE’. OOO ‘VO TPE’ transferred the gas turbines to be installed in Crimea. This contributes to establishing an independent power supply for Crimea and Sevastopol as a means of supporting their separation from Ukraine, and undermines the territorial integrity, sovereignty and independence of Ukraine. Responsible for the implementation of the construction project of the thermal power plants Balaklava and Tavricheskaya, where the turbines were installed.