Union contribution based on unit costs, lump sums and flat rates Template for submitting data for the consideration of the Commission
Date of submitting the proposal This Appendix is not required when EU-level simplified cost options established by the delegated act referred to in Article 94(4) of CPR are used. This refers to the code for the intervention field dimension in Table 1 of Annex I CPR. This refers to the code of a common indicator, if applicable. Priority Fund Specific objective Estimated proportion of the total financial allocation within the priority to which the simplified cost option will be applied in % Type(s) of operation covered Indicator triggering reimbursement Unit of measurement for the indicator triggering reimbursement Type of simplified cost option (standard scale of unit costs, lump sums or flat rates) Amount (in EUR) or percentage (in case of flat rates) of the simplified cost option Code Description Code Description Did the managing authority receive support from an external company to set out the simplified costs below? If so, please specify which external company: Yes/No – Name of external company Envisaged starting date of the selection of operations and envisaged final date of their completion (ref. Article 63(5) of CPR). For operations encompassing several simplified cost options covering different categories of costs, different projects or successive phases of an operation, the fields 1.3 to 1.11 need to be filled in for each indicator triggering reimbursement. If applicable, indicate the frequency and timing of the adjustment and a clear reference to a specific indicator (including a link to the website where this indicator is published, if applicable). Are there any potential negative implications on the quality of the supported operations and, if so, what measures (such as quality assurance) will be taken to offset this risk? 1.1 Description of the operation type including the timeline for implementation 1.2 Specific objective 1.3 Indicator triggering reimbursement 1.4 Unit of measurement for the indicator triggering reimbursement 1.5 Standard scale of unit cost, lump sum or flat rate 1.6 Amount per unit of measurement or percentage (for flat rates) of the simplified cost option 1.7 Categories of costs covered by the unit cost, lump sum or flat rate 1.8 Do these categories of costs cover all eligible expenditure for the operation? (Y/N) 1.9 Adjustment(s) method 1.10 Verification of the achievement of the units delivered describe what document(s)/system will be used to verify the achievement of the units delivered describe what will be checked and by whom during management verifications describe what arrangements will be made to collect and store the relevant data/documents 1.11 Possible perverse incentives, mitigating measures and the estimated level of risk (high/medium/low) 1.12 Total amount (national and EU) expected to be reimbursed by the Commission on this basis Source of data used to calculate the standard scale of unit costs, lump sums or flat rates (who produced, collected and recorded the data; where the data are stored; cut-off dates; validation, etc.): Please specify why the proposed method and calculation based on Article 88(2) of CPR is relevant to the type of operation: Please specify how the calculations were made, in particular including any assumptions made in terms of quality or quantities. Where relevant, statistical evidence and benchmarks should be used and, if requested, provided in a format that is usable by the Commission: Please explain how you have ensured that only eligible expenditure was included in the calculation of the standard scale of unit cost, lump sum or flat rate: Assessment of the audit authority or authorities of the calculation methodology and amounts and the arrangements to ensure the verification, quality, collection and storage of data:
← Appendix 1 · All articles · anx_1__cpt_1__table_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-11-02 · Text as adopted (Official Journal); later amendments are not incorporated in this text.