anx_II__para__12
The table below shall include a reference to steps, stages, or operations that EFSA identified as critical, a control criterion for each critical parameter, the involved control instruments, and the description of corrective actions in case the control criterion fails. Further information of the evaluation of complex control rules shall be added if relevant.
← 2.6. Control of critical decontamination operations · All articles · anx_II__table__11 →
Source: EUR-Lex (Cellar) · retrieved 2026-11-25 · Text as adopted (Official Journal); later amendments are not incorporated in this text.