lexiara

art_32__para_1

1. The following additional requirements shall apply to the operation of recycling installations that already manufactured recycled plastic materials and articles in which the recycled plastic is used behind a plastic functional barrier before 10 October 2022: the decontamination installation manufacturing the recycled plastic as well as any post-processing installation adding the functional barrier is included in a list of installations submitted by a developer notifying the specific recycling technology applied by all the installations on the list in accordance with Article 10(2); and, results from migration tests, challenge tests, and/or migration modelling, as appropriate and applicable to the notified recycling technology and to the specifics of the process that the recycling installation applies, unequivocally show that the functional barrier is capable, taking into account the contamination level of the recycled plastic, of acting as a functional barrier in accordance with Regulation (EU) No 10/2011 during the foreseeable shelf-life of the manufactured recycled plastic materials and articles, which comprises the time from their manufacture onwards, and the maximum shelf-life of the packaged food, if any. The developer shall communicate the list referred to in point (i) and a study report incorporating the test results required under point (ii) to the competent authority and to the Commission before 10 April 2023. A robust summary of the study shall be part of the initial report published in accordance with Article 10(4).

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-25 · Text as adopted (Official Journal); later amendments are not incorporated in this text.