(4)
for each type of network port: the period after which the power management function switches the equipment into networked standby; the remotely initiated trigger that is used to reactivate the equipment; the (maximum) performance specifications; the (maximum) power consumption of the equipment in networked standby into which the power management function will switch the equipment, if only that port is used for remote activation; the communication protocol used by the equipment;
← — · All articles · — →
Source: EUR-Lex (Cellar) · retrieved 2026-11-19 · Text as adopted (Official Journal); later amendments are not incorporated in this text.