Article 33 — Operational obligations of notified bodies
1. A notified body shall carry out conformity assessments in accordance with the conformity assessment procedures set out in Article 48(2), Article 51 or Annex VIII, as determined by the scope of the notification made in accordance with Article 29. 2. A notified body shall carry out conformity assessments in a proportionate manner, avoiding the creation of an unnecessary burden for economic operators, and taking due account of the size of an undertaking, the sector in which the undertaking operates, the structure of the undertaking, the degree of complexity of the battery to be assessed and the mass or serial nature of the production process. The notified body shall nevertheless respect the degree of rigour and the level of protection required for the compliance of the battery and of economic operators with this Regulation. 3. Where a notified body finds that the applicable requirements laid down in Articles 6 to 10 and Articles 12, 13, 14, 49 and 50, in corresponding harmonised standards referred to in Article 15, common specifications referred to in Article 16 or other technical specifications have not been met, it shall require the manufacturer or other relevant economic operator to take appropriate corrective action in anticipation of a second and final conformity assessment, unless the deficiencies cannot be remedied. Where the deficiencies cannot be remedied, the notified body shall not issue the certificate of conformity or approval decision. 4. Where, in the course of the monitoring of conformity following the issue of an approval decision, a notified body finds that there is no longer compliance, it shall require the manufacturer or the economic operator referred to in Article 48(1) as applicable, to take appropriate corrective action and shall suspend or withdraw the approval decision, if necessary. 5. Where corrective action as referred to in paragraph 4 is not taken or does not have the required effect, the notified body shall restrict, suspend or withdraw the approval decision, as appropriate.
← 4 · All articles · 1 →
Source: EUR-Lex CELLAR · retrieved 2026-08-26