ntr2-L_202302411EN.005301-E0002
(2) Control point: the checkpoint step or steps within the production process where the control measure is applied.
← ntr1-L_202302411EN.005301-E0001 · All articles · ntr3-L_202302411EN.005301-E0003 →
Source: EUR-Lex (Cellar) · retrieved 2026-10-12 · Text as adopted (Official Journal); later amendments are not incorporated in this text.