(31)
the following articles are inserted: ‘Article 27a Innovation centre for industrial transformation and emissions 1. The Commission shall establish and operate an innovation centre for industrial transformation and emissions (the “centre” or “Incite”). 2. The centre shall collect and analyse information on innovative techniques, including emerging and transformative techniques, which contribute inter alia to minimisation of pollution, decarbonisation, resource efficiency, a circular economy using fewer or safer chemicals, relevant to activities within the scope of this Directive, and characterise their level of development and their environmental performance. The Commission shall take into account the findings of the centre when preparing the work programme for the exchange of information referred to in Article 13(3), point (b), and when drawing up, reviewing and updating the BAT reference documents referred to in Article 13(1). 3. The centre shall be assisted by: 4. The centre shall make its findings public, subject to the restrictions laid down in Article 4(1) and (2) of Directive 2003/4/EC. The Commission shall adopt an implementing act setting out the detailed arrangements necessary for the establishment and functioning of the centre. That implementing act shall be adopted in accordance with the examination procedure referred to in Article 75(2). Article 27b Testing of emerging techniques Without prejudice to Article 18, the competent authority may grant temporary derogations from the requirements set out in Article 15(2), (3) and (4) and from the principles set out in Article 11, points (a) and (b), for the testing of emerging techniques for a total period of time not exceeding 30 months, provided that after the period specified in the permit, either the testing of the technique is stopped or the activity achieves at least the BAT-AELs. Article 27c Emission levels and indicative environmental performance values associated with emerging techniques By way of derogation from Article 21(3), the competent authority may set: Article 27d Transformation towards a clean, circular and climate-neutral industry 1. Member States shall require that operators by 30 June 2030 include in their EMS an indicative transformation plan covering their activities as listed in points 1, 2, 3, 4, 6.1 a, and 6.1 b of Annex I. The transformation plan shall contain information on how the operator will transform the installation during the 2030-2050 period to contribute to the emergence of a sustainable, clean, circular, resource-efficient and climate-neutral economy by 2050, including where relevant deep industrial transformation as referred to in Article 27e. Member States shall take the necessary measures to ensure that, no later than a year after the deadline set out in the first subparagraph of this paragraph, the audit organisation referred to in Article 14a(4), sixth subparagraph, assesses the conformity of the transformation plans referred to in the first subparagraph of this paragraph with the requirements set out in the delegated act referred to in paragraph 5 of this Article. 2. Member States shall require that, as part of the review of the permit conditions pursuant to Article 21(3) following the publication of decisions on BAT conclusions after 1 January 2030, the operator includes in its EMS a transformation plan for each installation carrying out any activity listed in Annex I that is not referred to in paragraph 1 of this Article. The transformation plan shall contain information on how the operator will transform the installation during the 2030-2050 period in order to contribute to the emergence of a sustainable, clean, circular and climate-neutral economy by 2050, in accordance with the requirements set out in the delegated act referred to in paragraph 5 of this Article. Member States shall take the necessary measures to ensure that, no later than a year after completion of the review referred to in Article 21(3), the audit organisation referred to in Article 14a(4), sixth subparagraph, assesses the conformity of the transformation plans referred to in the first subparagraph with the requirements set out in the delegated act referred to in paragraph 5 of this Article. 3. Where two or more installations are under the control of the same operator, or if the installations are under the control of different operators that are part of the same company, in the same Member State, those installations may be covered by one transformation plan. Where elements of the transformation plans have already been developed in accordance with other Union legislation and are compliant with this Article, a reference may be made in the transformation plan to the relevant documents. 4. The operator shall make its transformation plan, updates of the transformation plan, as well as the results of the assessment referred to in paragraphs 1 and 2 public, as part of the publication of relevant information set out in the EMS as referred to in Article 14a(4). 5. The Commission shall, by 30 June 2026, adopt a delegated act in order to supplement this Directive by specifying the content for the transformation plans, on the basis of the information required under paragraphs 1, 2 and 3. The Commission shall, by 31 December 2034, review and, where appropriate, revise the delegated act referred to in the first subparagraph. Article 27e Deep industrial transformation 1. Without prejudice to Article 18, in the event of deep industrial transformation of the installation set out in the relevant transformation plan covering the installation, the competent authority may extend the period for the installation to comply with the updated permit conditions referred to in Article 21(3) up to a total of eight years maximum, provided that: Member States shall inform the Commission at least yearly of derogations granted as part of their reporting to the Commission under Article 72. 2. Without prejudice to Articles 18 and 22, in the event of deep industrial transformation consisting of the closure of an installation and its replacement by a new installation set out in the relevant transformation plan covering the installation and to be completed within 8 years of publication of decisions on BAT conclusions, in accordance with Article 13(5), relating to the main activity of the existing installation, the competent authority may waive the obligation of updating the permit in accordance with Article 21(3), provided that all the following conditions are met: Member States shall inform the Commission as part of their reporting under Article 72 at least yearly of derogations granted.’ ; representatives of Member States; relevant public institutions; relevant research institutes; research and technology organisations; representatives of the industries and farmers concerned; technology providers; non-governmental organisations promoting the protection of human health or the environment; the Commission. emission limit values that ensure that, within 6 years of publication of a decision on BAT conclusions in accordance with Article 13(5) relating to the main activity of an installation, emissions do not, under normal operating conditions, exceed emission levels associated with emerging techniques as laid down in the decisions on BAT conclusions; indicative environmental performance values consistent with the decisions on BAT conclusions. the permit for the installation contains a description of the deep industrial transformation, the emission levels and the resource efficiency that will be achieved, and the implementation timeline and milestones; the operator reports annually to the competent authority on the progress in the implementation of the deep industrial transformation; and during the period granted for the transformation of the installation, the competent authority ensures that no significant pollution is caused and that a high level of protection of the environment as a whole is achieved. the permit for the existing installation contains a description of the closure plan and the associated timeline and milestones; the operator reports annually to the competent authority on the progress in relation to the closure plan for the existing installation and to its replacement by a new installation; during the period preceding the closure of the installation, the competent authority ensures that no significant pollution is caused and that a high level of protection of the environment as a whole is achieved.
← 30) · All articles · a) →
Source: EUR-Lex (Cellar) · retrieved 2026-10-13 · Text as adopted (Official Journal); later amendments are not incorporated in this text.