lexiara

art_4__para_5__para

Where the equipment is subject to leak checks under Article 5(1) and a leak in the equipment has been repaired, the operators of the equipment shall ensure that the equipment is checked by a natural person who is certified in accordance with Article 10 at the earliest after an operating time of 24 hours has elapsed but not later than 1 month after the repair to verify that the repair has been effective. For mobile equipment listed in Article 5(3), points (a), (b) and (c), a leak check may be carried out directly after a repair.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-07 · Text as adopted (Official Journal); later amendments are not incorporated in this text.