lexiara

‘(c)

CRR3

institutions’ IRB-CCF shall reflect the possibility of additional drawings by the obligor up to and after the time a default event is triggered;’

All articles

Source: EUR-Lex (Cellar) · retrieved 2026-09-25 · Text as adopted (Official Journal); later amendments are not incorporated in this text.