anx_VI__para
For products referred to in Article 33(1), point (c), within 1 month from the reception of the technical file, in the cases referred to in points 1.1 and 1.2, a contract shall be concluded respectively between the manufacturer or the Group and the responsible TAB for the production of the European technical assessment, specifying the work programme for drawing up the European assessment document, including:
← 2. Contract · All articles · (a) →
Source: EUR-Lex (Cellar) · retrieved 2026-10-17 · Text as adopted (Official Journal); later amendments are not incorporated in this text.