| On Danube River between Straubing – Deggendorf (about 40 km), the conditions for navigation during the low water periods (draught 2 m) were never put in place, contrary to the section up- (2,90 m) and downstream (2,70 m) making this a bottleneck. The draught of 2,50 m can only been reached on middle water, which is available for only 144 days/year. The aim of the project is to overcome this obstacle to navigation, and to build improved flood protection measures. The final design will result in the deepening of the riverbed by 20 cm to -2,20 cm, as compared to today’s low water stand of -2,00 m. It will also further deepen the riverbed by 45 cm to -2,65 cm. in a 9,7 km long section. Meanwhile the flood protection measures should provide protection against Q100 (the maximum discharge occurring once within a 100-year period).