doc__table__50
Box 3 Examples of elements of the plan or project to be considered during screening — size (e.g. in relation to direct land-take); — overall affected area including the area affected by indirect impacts (e.g. noise, turbidity, vibrations); — physical changes in the environment (e.g. modification of riverbeds or morphology of other water bodies, changes in the density of forest cover); — changes in the intensity of an existing pressure (e.g. increase in noise, pollution or traffic); — resource requirements (e.g. water abstraction, mineral extraction); — emissions (e.g. nitrogen deposition) and waste (and whether they are disposed of on land, water or in the air); — transportation requirements (e.g. access roads); — duration of construction, operation, decommissioning, etc.; — temporal aspects (timing of the different stages of a plan or project); — distance from Natura 2000 sites and in particular from their designating features; — cumulative impacts with other projects and plans.
← sec_3_1_2__para__4 · All articles · 3.1.3. Schritt 3: Ermittlung der Natura-2000-Gebiete, die von dem Plan oder dem Projekt betroffen sein könnten →
Source: EUR-Lex (Cellar) · retrieved 2026-09-25 · Text as adopted (Official Journal); later amendments are not incorporated in this text.