lexiara

ntr149-C_202401645EN.000101-E0149

(149) See, for example, case M.8134 Siemens/Gamesa, paragraphs 75-80, which explain that the number of contracts for wind turbines awarded was a more relevant metric in that case than the installed base of wind turbines, due to a time lag between award and installation.

All articles

Source: EUR-Lex (Cellar) · retrieved 2026-09-25 · Text as adopted (Official Journal); later amendments are not incorporated in this text.