Schedule 24, paragraph 1(1)
In this Schedule— “cogeneration” means the simultaneous generation in one process of thermal energy and electrical or mechanical energy; “connection distance” means— expressed in kilometres; in the case of a hot water link, the thermal capacity in kilowatts of the source or demand, whichever is smaller, multiplied by 0.0038, or in the case of a steam heat link, the thermal capacity in kilowatts of the source or demand, whichever is smaller, multiplied by 0.0012, “cost-benefit analysis” means a cost-benefit analysis in accordance with Part 2 to Annex IX to the Energy Efficiency Directive; “economically justified demand” means demand that does not exceed the needs for heating or cooling and which would otherwise be satisfied at market conditions by energy generation processes other than cogeneration; “high-efficiency cogeneration” means cogeneration meeting the criteria laid down in Annex II to the Energy Efficiency Directive; “installation” means— a stationary technical unit where one or more activities listed in Part 2 of Schedule 1 are carried on, ... a small waste incineration plant; or a medium combustion plant; “relevant installation” means an installation carrying on— an activity described in Part A(1) of Section 1.1 of Part 2 of Schedule 1, an activity described in Part A(1) of Section 5.1 of Part 2 of Schedule 1, an activity described in paragraph (a) of Part B of Section 1.1 of Part 2 of Schedule 1, ... a small waste incineration plant operation; or a medium combustion plant operation; “substantially refurbished” means, subject to sub-paragraph (2)(e), a refurbishment the cost of which exceeds 50% of the investment cost for a new comparable energy plant.
← 1 · All articles · 2 →
Source: legislation.gov.uk · retrieved 2026-07-30