Schedule 25, Part 2, paragraph 12
The Environmental Permitting (England and Wales) Regulations 2016 · United Kingdom
Clearance of purpose-built sediment traps. For the purposes of this paragraph, the specific conditions are— only sand and silt is cleared from the trap, the works do not result in sand or silt being transmitted downstream, and where the sand and silt from the clearance is spread on the floodplain, it is spread to a depth of no more than 100mm and no closer than 8 metres from the landward side of either bank.
← 2 · All articles · 1 →
Source: legislation.gov.uk · retrieved 2026-07-30