Schedule 3, Part 1, Chapter 3, paragraph 32(3)
For the purposes of this paragraph, the specific conditions are that— the total quantity of waste treated or stored over any 12-month period does not exceed 15,000 litres, the biobed or biofilter is located at a secure place that is— at least 10 metres from a watercourse; at least 50 metres from a spring or well or from any borehole not used to supply water for domestic or food production purposes; at least 250 metres from any borehole used to supply water for domestic or food production purposes; not within a zone defined by a 50-day travel time for groundwater to reach a groundwater abstraction that is used to supply water for domestic or food production purposes, the biobed or biofilter— is designed and maintained for the treatment operation; has an impermeable lining, and the treatment is carried on at the place of production.