lexiara

2.

The activities of the notified body responsible for the EC verification of a subsystem shall begin at the design stage and shall cover all of the manufacturing period up to the type-approval stage before a subsystem is placed in service.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-29 · Text as adopted (Official Journal); later amendments are not incorporated in this text.