sec_3_2__3__para
The instrumentation and sample probes shall be installed as required. The tailpipe shall be connected to the full flow dilution system.
← 3.2. Installation of the measuring equipment · All articles · 3.3. Starting the dilution system and the engine →
Source: EUR-Lex (Cellar) · retrieved 2026-11-01 · Text as adopted (Official Journal); later amendments are not incorporated in this text.