lexiara

3.3.1. Net maximum electrical capacity and peak load

The capacity should be reported at 31 December of the relevant reported year. Includes electrical capacity of both electricity (only) and CHP plants. The net maximum electrical capacity is the sum of the net maximum capacities of all stations taken individually throughout a given period of operation. The period of operation assumed for present purposes is continuous running: in practice 15 hours or more per day. The net maximum capacity is the maximum power assumed to be solely active power that can be supplied, continuously, with all plant running, at the point of outlet to the network. The peak load is defined as the highest value of the power absorbed or supplied by a network or combination of networks within the country. The following quantities must be declared only for the network: 1. Total 2. Nuclear 3. Hydro 3.1. Of which: pumped storage 4. Geothermal 5. Solar 6. Tide, wave, ocean 7. Wind 8. Combustible fuels 8.1. Of which: steam 8.2. Of which: internal combustion 8.3. Of which: gas turbine 8.4. Of which: combined cycle 8.5. Of which: other To be specified if declared. 9. Peak load 10. Available capacity at time of peak 11. Date and time of peak load occurrence

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-31 · Text as adopted (Official Journal); later amendments are not incorporated in this text.