| 17 | Costs that relate directly to a specific contract include: (a) site labour costs, including site supervision; (b) costs of materials used in construction; (c) depreciation of plant and equipment used on the contract; (d) costs of moving plant, equipment and materials to and from the contract site; (e) costs of hiring plant and equipment; (f) costs of design and technical assistance that is directly related to the contract; (g) the estimated costs of rectification and guarantee work, including expected warranty costs; and (h) claims from third parties. These costs may be reduced by any incidental income that is not included in contract revenue, for example income from the sale of surplus materials and the disposal of plant and equipment at the end of the contract.