lexiara

anx_I__cpt_4__cpt_4__text_2

When preparing day-ahead network operation, the TSOs shall exchange information with neighbouring TSOs, including their forecast network topology, the availability and forecasted production of generation units, and load flows in order to optimise the use of the overall network through operational measures in compliance with the rules for secure network operation.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-29 · Text as adopted (Official Journal); later amendments are not incorporated in this text.