lexiara

Article 47 › 2

Where tenders can be made only after a visit to the site or after on-the-spot inspection of the documents supporting the procurement documents, the time limits for the receipt of tenders, which shall be longer than the minimum time limits set out in Articles 27 to 31, shall be fixed so that all economic operators concerned may be aware of all the information needed to produce tenders.

· All articles ·

Source: EUR-Lex CELLAR · retrieved 2026-09-04