lexiara

rec_9

(9) Each TSO should be required to prepare an individual grid model of its system and send it to TSOs responsible for merging them into a common grid model. The individual grid models should include information from generation and load units.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-01 · Text as adopted (Official Journal); later amendments are not incorporated in this text.