lexiara

(e)

Text with EEA relevance.

a FRR provider shall ensure that the FRR activation of the FRR providing units within a reserve providing group can be monitored. For that purpose, the FRR provider shall be capable of supplying to the reserve connecting TSO and the reserve instructing TSO real-time measurements of the connection point or another point of interaction agreed with the reserve connecting TSO concerning: time-stamped scheduled active power output; time-stamped instantaneous active power for: each FRR providing unit, each FRR providing group, and each power generating module or demand unit of a FRR providing group with a maximum active power output larger than or equal to 1,5 MW;

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-04 · Text as adopted (Official Journal); later amendments are not incorporated in this text.