lexiara

Article 45

Text with EEA relevance.

Each SGU which is a power generating facility owner of a type D power generating module connected to the transmission system shall provide the TSO with at least the following data: general data of the power generating module, including installed capacity and primary energy source; turbine and power generating facility data including time for cold and warm start; data for short-circuit current calculation; power generating facility transformer data; FCR data of power generating modules offering or providing that service, in accordance with Article 154; FRR data of power generating modules offering or providing that service, in accordance with Article 158; RR data of power generating modules that offer or provide that service in accordance with Article 161; data necessary for restoration of the transmission system; data and models necessary for performing dynamic simulation; protection data; data necessary for determining the costs of remedial actions in accordance with Article 78(1)(b); where a TSO makes use of market based mechanisms in line with Article 4(2)(d), the provision of prices to be paid by the TSO shall be considered sufficient; voltage and reactive power control capability. Each SGU which is a power generating facility owner of a type B or a type C power generating module connected to the transmission system shall provide the TSO with at least the following data: general data of the power generating module, including installed capacity and primary energy source; data for short-circuit current calculation; FCR data according to the definition and requirements of the Article 173 for power generating modules offering or providing that service; FRR data for power generating modules that offer or provide that service; RR data for power generating modules that offer or provide that service; protection data; reactive power control capability; data necessary for determining the costs of remedial actions in accordance with Article 78(1)(b); where a TSO makes use of market based mechanisms in line with Article 4(2)(d), the provision of prices to be paid by the TSO shall be considered sufficient; data necessary for performing dynamic stability assessment according to Article 38. A TSO may request the power generating facility owner of a power generating module connected to the transmission system to provide further data where appropriate for operational security analysis in accordance with Title 2 of Part III. Each HVDC system owner or interconnector owner shall provide the TSO with the following data regarding the HVDC system or interconnector: nameplate data of the installation; transformers data; data on filters and filter banks; reactive power compensation data; active power control capability; reactive power and voltage control capability; active or reactive operational mode prioritization, if existing; frequency response capability; dynamic models for dynamic simulation; protection data; and fault-ride-through capability. Each AC interconnector owner shall provide the TSO with at least the following data: nameplate data of the installation; electrical parameters; associated protections.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-04 · Text as adopted (Official Journal); later amendments are not incorporated in this text.