lexiara

CHAPTER 4

Text with EEA relevance.

Each SGU which is a power generating facility owner of a type D power generating module connected to the transmission system shall provide the TSO with at least the following data: general data of the power generating module, including installed capacity and primary energy source; turbine and power generating facility data including time for cold and warm start; data for short-circuit current calculation; power generating facility transformer data; FCR data of power generating modules offering or providing that service, in accordance with Article 154; FRR data of power generating modules offering or providing that service, in accordance with Article 158; RR data of power generating modules that offer or provide that service in accordance with Article 161; data necessary for restoration of the transmission system; data and models necessary for performing dynamic simulation; protection data; data necessary for determining the costs of remedial actions in accordance with Article 78(1)(b); where a TSO makes use of market based mechanisms in line with Article 4(2)(d), the provision of prices to be paid by the TSO shall be considered sufficient; voltage and reactive power control capability. Each SGU which is a power generating facility owner of a type B or a type C power generating module connected to the transmission system shall provide the TSO with at least the following data: general data of the power generating module, including installed capacity and primary energy source; data for short-circuit current calculation; FCR data according to the definition and requirements of the Article 173 for power generating modules offering or providing that service; FRR data for power generating modules that offer or provide that service; RR data for power generating modules that offer or provide that service; protection data; reactive power control capability; data necessary for determining the costs of remedial actions in accordance with Article 78(1)(b); where a TSO makes use of market based mechanisms in line with Article 4(2)(d), the provision of prices to be paid by the TSO shall be considered sufficient; data necessary for performing dynamic stability assessment according to Article 38. A TSO may request the power generating facility owner of a power generating module connected to the transmission system to provide further data where appropriate for operational security analysis in accordance with Title 2 of Part III. Each HVDC system owner or interconnector owner shall provide the TSO with the following data regarding the HVDC system or interconnector: nameplate data of the installation; transformers data; data on filters and filter banks; reactive power compensation data; active power control capability; reactive power and voltage control capability; active or reactive operational mode prioritization, if existing; frequency response capability; dynamic models for dynamic simulation; protection data; and fault-ride-through capability. Each AC interconnector owner shall provide the TSO with at least the following data: nameplate data of the installation; electrical parameters; associated protections. Each SGU which is a power generating facility owner of a type B, C or D power generating module connected to the transmission system shall provide the TSO with at least the following data: active power output and active power reserves amount and availability, on a day-ahead and intra-day basis; without any delay, any scheduled unavailability or active power restriction; any forecasted restriction in the reactive power control capability; and as an exception to points (a) and (b), in regions with a central dispatch system, data requested by the TSO for the preparation of its active power output schedule. Each HVDC system operator shall provide the TSOs with at least the following data: active power schedule and availability on a day-ahead and intra-day basis; without delay its scheduled unavailability or active power restriction; and any forecast restriction in the reactive power or voltage control capability. Each AC interconnector or line operator shall provide its scheduled unavailability or active power restriction data to the TSOs. Unless otherwise provided by the TSO, each significant grid user which is a power generating facility owner of type B, C or D power generating module shall provide the TSO, in real-time, at least the following data: position of the circuit breakers at the connection point or another point of interaction agreed with the TSO; active and reactive power at the connection point or another point of interaction agreed with the TSO; and in the case of power generating facility with consumption other than auxiliary consumption net active and reactive power. Unless otherwise provided by the TSO, each HVDC system or AC interconnector owner shall provide, in real-time, at least the following data regarding the connection point of the HVDC system or AC interconnector to the TSOs: position of the circuit breakers; operational status; and active and reactive power.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-04 · Text as adopted (Official Journal); later amendments are not incorporated in this text.