Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (Text with EEA relevance. ) · European Union
For each internal relevant asset which is a power generating module or demand facility, the TSO shall: inform the owner of the relevant power generating module or relevant demand facility about its inclusion in the list; inform DSOs about the relevant power generating modules and the relevant demand facilities which are connected to their distribution system; and inform CDSOs about the relevant power generating modules and the relevant demand facilities which are connected to their closed distribution system.