lexiara

art_19__para_6__text_1

Text with EEA relevance.

The provisions in this Directive concerning smart metering systems shall apply to future installations and to installations that replace older smart meters. Smart metering systems that have already been installed, or for which the ‘start of works’ began, before 4 July 2019, may remain in operation over their lifetime but, in the case of smart metering systems that do not meet the requirements of Article 20 and Annex II, shall not remain in operation after 5 July 2031.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-30 · Text as adopted (Official Journal); later amendments are not incorporated in this text.