lexiara

(1)

If the equipment has one type of network port and if two or more ports of that type are available, one of those ports is randomly chosen and that port is connected to the appropriate network complying with the port’s maximum specification. If the equipment has multiple wireless network ports of the same type, the other wireless ports shall be deactivated if possible. If the equipment has multiple wired network ports of the same type, the other network ports shall be disconnected. If only one network port is available, that port is connected to the appropriate network complying with the port’s maximum specification. The tested unit is switched on. The device that provides the remotely initiated trigger that will reactivate the tested unit is connected to the appropriate network, switched on, and ready to provide the trigger when required to. Once the tested unit is switched on and working properly, it is allowed to go into networked standby and the power consumption is measured. Then the appropriate trigger is given to the unit through the network port and a check is made on whether the equipment is reactivated.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-19 · Text as adopted (Official Journal); later amendments are not incorporated in this text.