(i)
CRR3
point (c) is replaced by the following: ; institutions’ IRB-CCF shall reflect the possibility of additional drawings by the obligor up to and after the time a default event is triggered;’
← a) · All articles · art_1__point_106__point_a__point_i__table →
Source: EUR-Lex (Cellar) · retrieved 2026-09-25 · Text as adopted (Official Journal); later amendments are not incorporated in this text.